Subpanel Installations for Auburn Homes

When your main panel can't keep up with a garage, workshop, or addition, a subpanel gives that space its own dedicated power. King Electric and Solar handles the full installation across Auburn and Placer County.

Licensed, insured, and review-backed

8+

Cities Served Across the Region

6

Core Electrical and Solar Services

1

Local Team, No Franchise Dispatch

About Us

Local Electricians Who Know Subpanel Work

King Electric and Solar is based in Auburn, CA and serves homeowners and businesses throughout Placer County and the surrounding communities. Subpanel installations are a regular part of our work, whether the job involves a detached garage, a home addition, or a shop that needs its own breaker space. We focus on doing the work correctly and leaving the site clean.

Years Badge
Crew
Install
Service benefits

What Our Subpanel Service Covers

Each installation is handled by licensed electricians with the permits and materials to get the job done to code.

01

Subpanel sizing based on your actual load requirements

02

Dedicated circuit runs from main panel to subpanel

03

Permit pulling and local code compliance throughout

04

Installations for garages, workshops, ADUs, and additions

05

Coordination with utility requirements when applicable

06

Clean breaker labeling and panel documentation at completion

07

Serving Auburn, Roseville, Rocklin, Folsom, and Lincoln

Testimonials

Subpanel Installations Reviews

Recent customer feedback about subpanel installations services.

4.9 • 66 reviews
Google ReviewsLeave us a review

Upgraded batteries for my off grid home. Excellent service and install. Easy to work with and quick to respond to any needs.

Owner reply

Thanks so much Alisa, moving those 800lb batteries was a challenge. We look forward to being your solar provider of the…

Alisa profile

Alisa

2026-07-03

Very good nice guys. They just didn't come at the time I had purposely set.

Owner reply

Judy, I am so sorry we were early to the appointment. Hopefully we make it up to you with a free membership and…

Judy Pinegar profile

Judy Pinegar

2026-07-03

They upgraded our main panel and ran circuits for an ev charger, hot water heater and induction cooktop. Very thorough and courteous, communicated well.

Owner reply

Dee Dee, that was a good-sized project and we're glad it went smoothly. Getting the panel upgrade, EV charger, water…

Dee Dee Gunther profile

Dee Dee Gunther

2026-06-23

High quality service!

Owner reply

Blake, glad it landed that way. That's what we're going for on every job.

Blake profile

Blake

2026-06-15

Great experience with King Electric and Solar! I had a fantastic experience working with the team at King Electric and Solar. Blake Mitchell** started things off by walking me through the entire project. He took the…

Owner reply

Phil, Thank you so much for your king words. You were a pleasure to work with and we look forward to being your local…

Phillip Sharp profile

Phillip Sharp

2026-06-03

Amazing service! Super professional, easy to deal with, and the team is really personable and helpful. I called at the end of the day on the Friday before Memorial Day weekend, and JC showed up within literally 10…

Owner reply

Thank you so much Garrett, happy to get you up and running for the long weekend. Call if you ever need an electrician

Garrett Grice profile

Garrett Grice

2026-05-29

How It Works

From First Call to Final Inspection

Subpanel installations involve planning, permits, and precise wiring. Here's how we move through the job.

01Step 1

Site Assessment

We visit your property to evaluate the main panel capacity, the distance to the new subpanel location, and what loads need to be supported. This shapes everything that follows.

02Step 2

Permit and Planning

We pull the required permits through the local jurisdiction before any work begins. Skipping this step creates problems at resale and with insurance, so we don't skip it.

03Step 3

Installation

Our electricians run the feeder wiring, mount and wire the subpanel, connect circuits, and verify proper grounding and bonding throughout the installation.

04Step 4

Inspection and Sign-Off

We schedule the required inspection with the local authority and make sure the work passes. You receive documentation confirming the installation meets code.

Frequently asked

Subpanel Installation Questions

Find clear answers about service options, scheduling, preparation, and what to expect before you request an estimate.

Q1

What is a subpanel and when do I need one?

A subpanel is a secondary breaker box fed from your main panel. It's useful when you need power in a detached structure, a large addition, or any space that requires more circuits than running individual wires back to the main panel would allow.

Q2

Can my existing main panel support a subpanel?

It depends on how much spare capacity your main panel has. During our site visit, we check the available amperage and determine whether the main panel can feed a subpanel without an upgrade first.

Q3

How large a subpanel do I actually need?

Size is based on the total electrical load you plan to run in that space. A garage with basic lighting and an EV charger needs more capacity than a simple workshop. We calculate this during the assessment so you're not undersized or paying for more than necessary.

Q4

Do subpanel installations require a permit in Auburn, CA?

Yes. Placer County and the City of Auburn require permits for subpanel work. We handle permit applications as part of the job and schedule the required inspection.

Q5

How long does a subpanel installation take?

Most residential subpanel installations take one day once permits are approved. Jobs involving longer conduit runs, trenching for underground feeds, or coordination with the utility may take longer.

Q6

Can a subpanel be installed in a detached garage or ADU?

Yes, detached structures are one of the most common reasons homeowners call us for subpanel work. The feed can run overhead or underground depending on the layout and local code requirements.

Q7

Do you serve areas outside Auburn for subpanel jobs?

We do. Our service area covers Roseville, Rocklin, Folsom, Lincoln, Grass Valley, Nevada City, and El Dorado Hills in addition to Auburn.

Q8

Is a subpanel installation the right call if I'm also adding solar or an EV charger?

Sometimes. If your main panel is already near capacity and you're adding a solar system or EV charger, a subpanel may be part of the solution. We can look at your full electrical picture and recommend the approach that makes sense.

Ready to Add a Subpanel?

Call King Electric and Solar at (916) 597-0971 or send us a message to schedule an assessment for your Auburn area property.

Business logo

King Electric and Solar provides residential and commercial electrical services, solar installation, and EV charger setup throughout Auburn, CA and the surrounding Placer County communities. Local work backed by real experience

Contact us

© 2026 King Electric and Solar. All rights reserved.

Powered byNesta