ADU Electrical Installation in Auburn, CA

King Electric and Solar handles the full electrical scope for accessory dwelling units in Auburn and Placer County, from panel work to final connections, done correctly from the start.

Licensed, insured, and review-backed

8+

Cities Served Across the Region

6

Core Electrical and Solar Services

1

Local Team, No Franchise Dispatch

About Us

Local Electricians Who Know ADU Work

ADU electrical projects involve more than running a few circuits. Sub-panel sizing, dedicated metering, permit coordination, and load calculations all need to be handled correctly. King Electric and Solar works with homeowners across Auburn, Roseville, Rocklin, and surrounding Placer County communities to get ADU electrical installations done to code and ready for inspection.

Years Badge
Crew
Install
Service benefits

What Our ADU Electrical Service Covers

Every ADU has different electrical demands. Here is what we typically handle on these projects.

01

Sub-panel installation sized to your ADU's load requirements

02

Service upgrade to the main panel when needed

03

Dedicated circuits for kitchen, bath, and HVAC equipment

04

Outlet, switch, and lighting rough-in and trim-out

05

Smoke and carbon monoxide detector placement per code

06

EV charger circuit added during ADU build when requested

07

Final inspection walk-through and punch list corrections

Testimonials

ADU Electrical Installation Reviews

Recent customer feedback about adu electrical installation services.

4.9 • 66 reviews
Google ReviewsLeave us a review

Amazing service! Super professional, easy to deal with, and the team is really personable and helpful. I called at the end of the day on the Friday before Memorial Day weekend, and JC showed up within literally 10…

Owner reply

Thank you so much Garrett, happy to get you up and running for the long weekend. Call if you ever need an electrician

Garrett Grice profile

Garrett Grice

2026-05-29

Very professional and friendly. They did excellent work and expedited it because my electrical panel was in such a mess (very old).

Owner reply

Patricia, thank you so much. We're happy we got your system operating safely.

P Z profile

P Z

2026-04-02

Upgraded batteries for my off grid home. Excellent service and install. Easy to work with and quick to respond to any needs.

Owner reply

Thanks so much Alisa, moving those 800lb batteries was a challenge. We look forward to being your solar provider of the…

Alisa profile

Alisa

2026-07-03

Very good nice guys. They just didn't come at the time I had purposely set.

Owner reply

Judy, I am so sorry we were early to the appointment. Hopefully we make it up to you with a free membership and…

Judy Pinegar profile

Judy Pinegar

2026-07-03

They upgraded our main panel and ran circuits for an ev charger, hot water heater and induction cooktop. Very thorough and courteous, communicated well.

Owner reply

Dee Dee, that was a good-sized project and we're glad it went smoothly. Getting the panel upgrade, EV charger, water…

Dee Dee Gunther profile

Dee Dee Gunther

2026-06-23

High quality service!

Owner reply

Blake, glad it landed that way. That's what we're going for on every job.

Blake profile

Blake

2026-06-15

How It Works

Our ADU Electrical Installation Process

ADU electrical work follows a clear sequence tied to the construction schedule. We coordinate each phase so inspections pass and your project stays on track.

01Step 1

Site Review and Load Calculation

We visit the property, review your ADU plans, and calculate the electrical load to determine whether the existing service can support the addition or needs an upgrade.

02Step 2

Permit Submittal and Scheduling

We handle permit documentation for the electrical scope and schedule rough-in work to align with your general contractor's framing and insulation timeline.

03Step 3

Rough-In Installation

Conduit, wiring, sub-panel, and all rough electrical work get installed before drywall. We coordinate the rough inspection so you do not lose schedule days waiting.

04Step 4

Trim-Out and Device Installation

After drywall and paint, we return to install outlets, switches, fixtures, breakers, and any specialty circuits like EV chargers or dedicated appliance lines.

05Step 5

Final Inspection and Handoff

We complete the final inspection with the authority having jurisdiction, address any corrections on the spot when possible, and walk you through the completed electrical system.

Frequently asked

ADU Electrical Installation Questions

Find clear answers about service options, scheduling, preparation, and what to expect before you request an estimate.

Q1

Does an ADU always need its own electrical sub-panel?

Most ADUs do require a dedicated sub-panel to keep the unit's circuits separate from the main home. It also simplifies future metering if the unit is rented. We confirm what is required based on your local jurisdiction and load calculations during the initial visit.

Q2

Will my main electrical panel need to be upgraded for an ADU?

It depends on the current panel capacity and what the ADU will contain. A unit with electric cooking, a heat pump, and an EV charger adds meaningful load. We assess your existing service and let you know upfront whether an upgrade is necessary.

Q3

Do you pull the electrical permits for ADU projects?

Yes. We handle permit submittal for the electrical scope of the project. Permit requirements vary between Auburn, Roseville, Rocklin, and other Placer County jurisdictions, and we are familiar with the process in each area we serve.

Q4

Can you add a separate electric meter for the ADU?

Separate metering for an ADU involves coordination with PG&E and the local jurisdiction. We can install the electrical infrastructure to support a second meter and guide you through the utility application process.

Q5

How long does ADU electrical installation typically take?

The electrical scope itself is not the longest part of an ADU project, but scheduling inspections adds time. Rough-in typically takes one to two days. Trim-out is usually a single day. Total elapsed time depends on inspection scheduling and the rest of the construction timeline.

Q6

Can you also install solar or an EV charger as part of the ADU build?

Yes. King Electric and Solar installs solar systems and EV charger circuits, and it often makes sense to plan for those during the ADU electrical rough-in rather than adding them later at greater cost.

Q7

What areas near Auburn do you serve for ADU electrical work?

We serve Auburn, Roseville, Rocklin, Folsom, Lincoln, Grass Valley, Nevada City, and El Dorado Hills. If your project is in Placer County or the surrounding foothills, reach out and we can confirm coverage.

Q8

What information should I have ready when I call about an ADU project?

Having your ADU plans or a basic description of the unit size and intended use is helpful. We also want to know whether construction is already underway or in the planning stage. That lets us give you a realistic picture of what the electrical scope will involve.

Start Your ADU Electrical Project

Call King Electric and Solar at (916) 597-0971 or send us a message to discuss your ADU electrical installation in Auburn or anywhere in Placer County.